SPECJALISTYCZNE PRZEDSIĘBIORSTWO BUDOWY KOTŁOWNI i INSTALACJI PRZEMYSŁOWYCH
REFERENCE LIST
SINCE 1984
 
No.Facility & Year of Work’s Completion Investor Boiler / Installation Steam Output (Power of the Boilerhouse)Burner(s)
1. Steam Boiler House 1998 „Malta-Decor” S.A. Poznań 2x SEFAKO EOG 8 t steam/h 1x LOOS ZFR 28 t steam/h 44 t steam/h WEISHAUPT RGL 70
2. Steam Boiler House 1999 RUDAWA - DEKOR Rudawa LOOS ULS 10000/13 10 t steam/h WEISHAUPT
RL 60
3. Steam Boiler House 1991 ZAKŁAD BADAWCZO ROZWOJOWY "POLMOS" Konin BASOE Szwecja 6 t steam/h SEFAKO E-125 3,5 t steam/h 9,5 t steam/h POLMOR light fuel & mazout
4. Steam Boiler House 1994 WYTWÓRNIA WYROBÓW TYTONIOWYCH Poznań 2x LOOS ULS-4000 8 t steam/h WEISHAUPT RGL 60
5. Steam Boiler House 2005 „WYBOROWA” SA Poznań 2x LOOS ULS-3200/10 6,4 t steam/h WEISHAUPT
GL 40/2-A-TMD
6. Steam Boiler House 1998 & 2004 ZAKŁADY MIĘSNE "BARTEK" Sieraków + Ubojnia w Kłosowicach LOOS ULS-3200/10 2 x LOOS UL-S 1600/10 3,2 t steam/h 3,2 t steam/h WEISHAUPT
RGL 40/2-A
WEISHAUPT
GL-7
7. Steam Boiler House & proces steam 1998 HOCHLAND POLSKA Sp. z o.o. Kaźmierz LOOS ULS-2000/10 RUMIA - BASOE 100 3,0 t steam/h WEISHAUPT G 7 OILON - gas
8. Steam Boiler House 1997 GMINNA SPÓŁDZIELNIA "SAMOPOMOC CHŁOPSKA" Czarnków 2x EKOMET Pleszew KP 10/1100 3,0 t steam/h WEISHAUPT G 7
9. Steam Boiler House 1995 OKRĘGOWA SPÓŁDZIELNIA MLECZARSKA Czarnków 2x CLAYTON EOG 3,1 t steam/h CLAYTON
10. Steam Boiler House 1999 OKRĘGOWA SPÓŁDZIELNIA MLECZARSKA Chodzież 2x LOOS ULS-3200 6,4 t steam/h WEISHAUPT RGL40/2-A
11. Steam Boiler House 1996 FABRYKA KSZTAŁTEK STYROPIANOWYCH PROFI-ENAMEL Wronki LOOS ULS-2600 2,6 t steam/h WEISHAUPT
GL 7
12. Steam Boiler House 2001 GORZELNIA Komorniki k/Tulec LOOS UHD-3200 3,2 t steam/h WEISHAUPT
RG 8
13. Steam Boiler House 1993 OKRĘGOWA SPÓŁDZIELNIA MLECZARSKA Złotów 2x LOOS ULS-2600/13 5,2 t steam/h WEISHAUPT
GL 8
14. Steam Boiler House 1992 ZESPÓŁ SZKÓŁ ROLNICZYCH Poznań VIESSMANN RU / ND
2x 1070 kW
1,2 t steam/h KÖRTING VT-5
15. Water Boiler House 1994 AKADEMIA EKONOMICZNA Poznań 2x VIESSMANN Paromat Duplex 2140 kW WEISHAUPT GL8
16. Water Boiler House 1994 PRZEDSIĘBIORSTWO PKS Poznań 2x VIESSMAN Paromat Triplex 920 kW WEISHAUPT G3
17. Water Boiler House 1992 POZTEL S.A. Poznań 2x VIESSMANN Paromat Duplex 740 kW KÖRTING oil
18. Water Boiler House 1993 DRUKARNIA POZNAŃSKA Poznań 2x SCHAFER DOMOBLOCK 680 kW KÖRTING gas
19. Water Boiler House 1994 Beiersdorf-Lechia S.A. Poznań VIESSMANN Paromat Triplex 225 kW KÖRTING gas
20. Steam Boiler House 2004 / 2005 Zakład Mięsny „SKIBA” w Chojnicach LOOS U-DH 3200/10
I UL-S 1600
3,2 t steam/h WEISHAUPT
GL-7 gas/ oil
21. Steam Boiler House 2002 Zakład Mięsny „MATRO” Rawicz 1 x LOOS UH-D 1600/10 1,6 t steam/h WEISHAUPT oil
22. Steam Boiler House 2002 KRONOSPAN PL Szczecinek 1 x LOOS ZFR-IE 22000/20 22 t steam/h mazout/oil/gas SAACKE
type SKV G60
23. Process installations 2001 LISNER Sp. z o.o. Poznań frying installation based on boiler using heating oil 1400 kW WEISHAUPT oil
24. Steam Boiler House 2001 ROLMLECZ Zakład Mleczarski w Poznaniu 2 x LOOS 2600 5,6 t steam/h oil/gas WEISHAUPT
25. Steam Boiler House 2001 ICT Poland Sp. z o.o. Kostrzyn n/Odrą 2 x LOOS ULS- IE 14000 28 t steam/h oil/gas
WEISHAUPT
WK -type
26. Water Boiler House 2001 Bazalt Wilków 3 x Euronox Torus 2 x600 kW 240 kW oil - CUENOD oil - WEISHAUPT
27. Process installation for waste neutralisation 2000 Zakład Tworzyw Sztucznych. ERG Pustków 1x JUMEI 14 000 9 MW gas SAACKE
28. Process installations 2004 Zakł. Chemiczne POLICE Titanium white calcinating furnaces 2 x 13 MW 2x gas/oil SAACKE
29. Water Boiler House 2002 SEC Szczecin LOOS UTH-Z 32500 MW x 2 65 MW 4 x SAACKE gas/oil
30. Process installations 2003 AMCOR RENTCH Sp. z o.o. Łódź Thermal oil system . Heat exchangers - -
31. Process installations 2003 NORDENIA Sp. z o.o. Dopiewo Thermal oil system for printing machines, extension of the system in paint and solvent store - -
32. Process installations & Water Boiler House 2007 GESTAMP Polska Sp. z o.o. Września
Tłocznia blach karoseryjnych
LOOS UNIMAT UT 2500 x 6 Radiant heating system using water at 120oC as heating medium, cooling system for hydraulic & mechanical presses. 2650 kW WEISHAUPT
G 9/1-D gas
33. Process installations & Water Boiler House 2007 GONVARRI Polska Sp. z o.o. Września
Krajalnia blach karoseryjnych
LOOS UNIMAT UT 1350 x 6 Radiant heating system using water at 120oC as heating medium. 1350 kW WEISHAUPT
G 7/1-D gas
34. Steam Boiler House & Process installations 2006 POZNAŃ ONION Sp. z o.o. Siekierki Wielkie LOOS UL-S 1600 x 18 Process steam system. Heat exchanger vegetable oil/steam 1600 kg steam/h WEISHAUPT
G 9/1-D-ZM gas
35. Process installations 2004 Zakłady Chemiczne LUBOŃ Gas installation under control of The Office of Technical Inspection - -
36. Steam Boiler House 2004 „Delitissue” Sp. z o.o. Ciechanów LOOS UL-S 16000 x 20 16 000 kg steam/h SAACKE gas GS125-30
37. Water Boiler House 2006 SCHATTDECOR Sp. z o.o. Tarnowo Podgórne VIESSMANN 285 kW – 1 set VIESSMANN 105 kW – 1 set 390 kW RIELLO RS 28 TC gas
38. Process installations 2005 Zakłady Mięsne „BARTEK“ w Kłosowicach Water process installations of 83oC; 55oC & 40oC. Water process installations of 55oC & 25 bar. Steam process installation. Compressed air proces installations for scorching & dehairing machine & for slaughterhouse offal pneumatic conveying TAJFUN. - -
39. Steam Boiler House & Process installations 2005 Fabryka Tektury TFP Sp. z o.o.
Dziećmierowo k/Kórnika
LOOS UL-S 8000/16 8000 kg steam/h WEISHAUPT
RG 70 gas
40. Steam Boiler House (development) 2005 / 2006 Fabryka Papieru „Malta-Decor” S.A.
Zakład w Rudawie
VIESSMANN 12 000 kg steam/h WEISHAUPT
RGL 70 gas
41. Steam Boiler House & in-site water purification plant 270 m3/h 2006 / 2007 Kompania Piwowarska S.A. Poznań LOOS UL-SIE 18 t
steam/h x 3
54000 kg steam/h WEISHAUPT
WK x 3 gas/oil
42. Process installation of paper manufacture 2007 Fabryka Papieru „Malta-Decor” S.A.
Zakład w Poznaniu i
Zakład w Rudawie
Steam condenser pipelines of DN 200 and smaller for paper facilities made of China - -
43. Amic-resisting installation 2008 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Process installation for two 1 200 l/sec efficient ATLAS COPCO compression generators & four Domnik Hunter PNEUDRI air dryers. - -
44. Process installations for paper production 2008 Fabryka Papieru „Malta-Decor” S.A. Poznań Steam condenser system installation for MP3. Steam site assembly for steam boiler house to MP3 workshop. - -
45. Steam Boiler House & hot water return supply pipeline exchange 2007 Wielkopolskie Przedsiębiorstwo Przemysłu Ziemniaczanego S.A.
Strzałkowo-Staw
LOOS UL-S-IE 5000 x 16 5000 kg steam/h WEISHAUPT gas/oil
46. Steam Boiler House 2009 Gospodarstwo Rolno-Hodowlane
GĄSIOREK – FARM
Czerniejewo
Steam generator LOOS DF 1500 1,5 t steam/h WEISHAUPT gas/oil
47. Gas Boiler House 2009 Akademia Ekonomiczna Poznań VIESSMANN 100 kW GIERSCH gas
48. Process installations 2010 Okręgowa Spółdzielnia Mleczarska w Czarnkowie. Zakład Produkcyjny w Chodzieży. Steam generator & condenser for spray drying tower for powder milk production - -
49. Water Boiler House 2010 GESTAMP Polska Sp. z o.o Września Tłocznia blach karoseryjnych Expansion heating system. Water boiler LOOS UT 1400 X 6 UNIMAT installation. 1400 KW WEISHAUPT gas
50. Water Boiler House 2010 GESTAMP Polska Sp. z o.o Września
Tłocznia blach karoseryjnych
Expansion heating system.
Water boiler LOOS UT
1400 X 6 UNIMAT installation.
1400 KW WEISHAUPT gas
51. Steam Boiler House 2009 BOLS Sp. z o.o. Oborniki LOOS UL-S IE 4000 X 10 4 t steam/h WEISHAUPT gas
52. Process installations 2006 Kompania Piwowarska S.A. Poznań Compressed air installation of capacity 15 000 m3 /h for processing and beer manufacturing. - -
53. Process installations 2006 Kompania Piwowarska S.A. Poznań Compressed air installation of capacity 15 000 m3/h for processing and beer manufacturing. - -
54. Steam Boiler House 2007 / 2008 ICT Poland Sp. z o.o. Kostrzyn nad Odrą Expansion heating system. Water boiler LOOS ULS-IE
22 000 x 20
22 t steam/h WEISHAUPT gas
55. Process installations 2010/2011 PRISMADECOR Sp. z o.o. Głuchołazy Cooling water system installation for printing machines PML6 - -
56. Process installations 2010 Gospodarstwo Rolno – Hodowlane
GĄSIOREK – FARM
Czerniejewo
Process installation related to fur animal food manufacture & transportation machines. - -
57. Thermal Oil Boiler House 2008 Odazotownia Grodzisk Polskie Górnictwo Naftowe i Gazownictwo S.A. HOVAL 1800 kW Riello gas
58. Steam Boiler
House
2008 / 2009
AQUILA Radomsko Sp. z o.o. LOOS UL-S IE 8000 x 18 8 t steam/h WEISHAUPT gas
59. Steam Boiler
House
2009 / 2010
REM S.A. Nowogard Vitomax 200 HS M235 5 t steam/h Riello
gas / LPG
60. Water Boiler House 2009 COLSON Sp. z o.o. Komorniki Brötje Eurocondens SGB 120oC Gz50 & radiant heating system Winterwarm using gas 170 kW gas
61. Steam Boiler House 2009 Ali Baba Kebab Poznań JUMAG 240 kg steam/h Riello olej
62. Process installations 2009 UNIQ LISNER Sp. z o.o. Poznań Compressed air with drier produced by PARKER HANIFINN. - -
63. Process installations 2009 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Assembly of two air cooling units produced by PARKER with freezing water installation from cooling station to compressor room. - -
64. Pro-environmental installation 2009 „Malta-Decor” S.A. Poznań Pro-environmental installation of air system reduction targeted burning - -
65. Process installations 2009 Sławski Zakład Przetwórstwa Mięsa i Drobiu „Balcerzak I” Sp. z o.o. Sława –Wróblów Assembly of heating thermal centres with a capacity of
2 MW
- -
66. Process installations 2009 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Anti-corrosive technological water pipeline installation welded for new, mayonnaise production line. - -
67. Process installations 2009 Zespół Elektrowni Pątnów-Adamów-Konin S.A. Replacing 3 pcs. of oil pumps on the block No. 6 in power station PAK - -
68. Steam Boiler House (development) 2010 Zakłady Mięsne ŁMEAT-ŁUKÓW S.A. Zakład Produkcyjny „Dolina Noteci” w Polanowie gm. Wyrzysk VIESSMANN
VITOMAX 200 HS
3,8 t steam/h DREIZLER gas
69. Technical project . Process installations. Control Instrumentation & Automation 2010 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Palm oil installation and by-pass units, such as vapour , condensate, air, nitrogen, water units. Design & execution of automation and control the unloading process and storage tanks. - -
70. Technical project & process installations. 2010 INDYKPOL S.A. Olsztyn Spray-evaporative condenser installation L=380 m
DN 150 & DN 80
- -
71. Technical project & process installations.
2010
PROFI-ENAMEL Wronki Granulate transport technological installation and foaming agent injection and new forms of new vapour, air, condensate, vacuum and cooling water pipeline system. - -
72. Steam Boiler House (development) 2010 LATTERIA TINIS Rzepin VIESSMANN
VITOMAX 200 HS
2,9 t steam/h RIELLO
gas/light oil
73. Technical project & process installations. 2011 AQUILA WRZEŚNIA Sp. z o.o.
Zakład we Wrześni
ul. Objazdowa
spray-evaporative condenser installation for corrugators. Boiler house extension. - -
74. Technical project & thermal oil boiler house assemble 2011 Przedsiębiorstwo Produkcyjno – Konsultingowe ADOB Poznań FERROLI 400 kW RIELLO light oil
75. Process installations 2011 SCHATTDECOR Sp. z o.o. Głuchołazy Gas installation for laminate unit with heating – ventilation unit. Cooling system for laminator cylinders installation. - -
76. Technical project & process installations. 2011 KRONOPOL Sp. z o.o. Żary Thermal oil system for MP2 press. Installation of pumps. - -
77. Valves,Control Instrumentation & Automation 2011 VOLKSWAGEN POZNAŃ Poznań Spray paint cabin’s modernization. Softweare & control of cabins - -
78. Process installations 2011 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Oil fryers and steam boiler renovation. Soda lye and nitrogen acid installation unit - -
79. Process installations 2011 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Processing water installation and public water system connection. - -
80. Valves,Control Instrumentation & Automation 2011 Kompania Piwowarska SA Browary Książęce TYCHY Oxygen regulators installation in burners combustion system in the steam boiler station. - -
81. Valves,Control Instrumentation & Automation 2011 Kompania Piwowarska SA Browary Książęce TYCHY Natural gas and bio-gas co-burning installation in the steam boiler station. - -
82. Valves,Control Instrumentation & Automation 2011 AQUILA WRZEŚNIA Sp. z o.o.
Września, ul. Objazdowa
Oxygen regulators installation in burners combustion system in the steam boiler station. - -
83. Process installations 2011 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Condensate installation in the pasta production area. - -
84. Process installations 2011 Kompania Piwowarska S.A. Poznań Industrial sewage averaging device installation. - -
85. Technical project & process installations. 2011 Kompania Piwowarska S.A. Poznań Heat recovery from steam boiler station of 54 steam tons /h. - -
86. Technical project & process installations. 2011 Kompania Piwowarska S.A. Poznań Media measurement system: beer, technological steam, water, carbon dioxide, condensate, compressed air. - -
87. Technical project & process installations. 2011 Kompania Piwowarska S.A. Poznań Diatomaceous earth tanks transition. - -
88. Technical project & process installations. 2011 AMICA SA Wronki Compressed air installation - -
89. Process installations 2012 NORDENIA Sp. z o.o. Dopiewo Thermal oil installation dedicated for power supply of laminator and subsequent flexographer unit - -
90. Process installations 2012 PEC WRZEŚNIA S.A. DALKIA Września Cogeneration system installation produced by CATERPILLAR of the capacity 2,5MW - -
91. Technical project & process installations. 2012 UNIQ LISNER Sp. z o.o. Poznań Steam supply hub for power system of refreezing unit of fish processing. - -
92. Process installations 2012 FARMUTIL HS S.A. Śmiłowo
64-810 Kaczory
ul. Przemysłowa 4
Measurement system of steam boiler station. (steam and condensate) - -
93. Process installations 2012 UNILEVER POLSKA S.A. Oddział Żywności Poznań Connecting to the media filling & packaging machine - SIG Combibloc , Bag In Box and pasteurizer Tetra Pack. - -
94. Process installations 2012 UNILEVER POLSKA S.A. Oddział Żywności Poznań Anti-corrosive technological sewage pipeline installation welded for new cooking unit SILO . - -
95. Process installations 2012 UNILEVER POLSKA S.A. Oddział Żywności Poznań Unload of sterilizer manufactured by Emmepiemme srl and its installation through the side elevation. Sterilizer connection to the supplies and their communication to the aseptic tank. - -
96. Process installations 2012 Kompania Piwowarska S.A. Poznań Provision, assembly and launch of four systems dedicated for clarity measurement of sweet wort in brewhouse. - -
97. Valves,Control Instrumentation & Automation 2012 KRONOSPAN Szczecinek Sp. z o.o.
Szczecinek ul. Waryńskiego 1
Changing the security automation and control system of the boiler LOSS 1 type ZFR 25000 - -
98. Process installations 2012 Cargill Animal Nutrition CARGILL (POLSKA)
64-120 Krzemieniewo ul. Dworcowa 167
Modernization of steam and condensate installation in the steam boiler house. - -
99. Process installations 2012 NORDENIA POLSKA POZNAŃ Sp. z o.o.
Dopiewo, ul. Wyzwolenia 34/36
Thermal oil installation dedicated for power supply of laminator and subsequent flexographer unit - -
100. Process installations 2012 FARMUTIL HS S.A. Śmiłowo
64-811 Kaczory
ul. Przemysłowa 4
Modernization of steam installation supplying destructors of animal fat manufacturing and meat & bone meal - -
101. Process installations 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Provision, assembly and launch of water system installation of deoxidized water. - -
102. Process installations 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Installation of beer waste disposal tank. - -
103. Process installations 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Process engineering installation of REDS beer. - -
104. Process installations 2012 UNIQ LISNER Sp. z o.o.
Poznań, ul. Strzeszyńska 38/42
Installation of CIP in the new manufacturing line of fish proceeding. - -
105. Technical expert opinion 2012 VOLKSWAGEN POZNAŃ Sp. z o.o.
ul. Warszawska 349
Extensive leak test the gas installation - -
106. Gas Boiler House 2012 Przedsiębiorstwo Produkcyjno – Konsultingowe ADOB Sp. z o.o. Poznań , ul. Kołodzieja 11 Modernization of thermal oil installation the steam oil boiler house. Supply of evaporator of W59 thermal oil. FERROLI
400 kW
RIELLO light oil
107. Container thermal oil boiler house 2012 NAFTAN Sp. z o.o.
17-106 ORLA
Oleksze 21
Container thermal oil boiler house supply including technical installation approach design of paraffin decontamination. Boiler OPX1000 1,163 MW light oil / LPG
108. Brewhouse department 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Turnover of water pipe system installation and condensate . - -
109. Filtration department 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Installation of valves dedicated for beer continuous intake for filtration. - -
110. Compressor room 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Installation of heat exchangers of air driers in compressor room - -
111. Bottling room 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Turnover of CIP pipe system installation in the bottling room. - -
112. Technological installations 2012 KOMPANIA PIWOWARSKA S.A.
Poznań, ul. Szwajcarska 11
Installation of antyscuffing system of bottles wash system. - -
113. Process installations 2012 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Installation of water recovery for „effluent pretreatment plant” of sewage. - -
114. Process installations 2012 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Media connecting to the aseptic tank - -
115. Process installations 2012 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Culinary steam installation. - -
116. Process installations 2012 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Transfer of wash plant trolleys and media installation. - -
117. Steam Boiler House 2013 SCHATTDECOR Sp. z o.o. Tarnowo Podgórne Steam generator YUMAG 560 kg steam/h WEISHAUPT/gas
118. Process installations 2013 SCHATTDECOR Sp. z o.o. Tarnowo Podgórne Nitrogen pipeline DN50,
230 m, of the flow capacity of 633Nm3 /h for inerting purposes for the needs of the production process
- -
119. Process installations 2013 KGHM Polska Miedź S.A.
Oddział Huta Miedzi „Głogów”
Głogów, ul. Żukowicka 1
Design and construction of the oil supply system for the installation of the third heating oil preheater for the Plant’s Fuel Station. Processing capacity
12.5 Mg/h.
- -
120. Process installations 2013 Kompania Piwowarska SA Poznań Filtracja Connecting of heat exchanger beer/ammonia at the filtration department. - -
121. Process installations 2013 PGNiG Zielona Góra
FX Warszawa
Kopalnia gazu ziemnego
Ośrodek grupowy
Treatment system for natural gas in the Lisewo natural gas mine. - -
122. Technological line 2013 VOLKSWAGEN POZNAŃ Sp. z o.o.
Poznań, ul. Warszawska 349
Overhaul of the KTL drying line. - -
123. Technological line 2013 VOLKSWAGEN POZNAŃ Sp. z o.o.
Poznań, ul. Warszawska 349
Installation of manholes on the FL and CC drying lines. - -
124. Technical project & process installations. 2013 KRONOPOL ŻARY Sp. z o.o. Żary Thermal oil system for MP2 press. Installation of pumps. - -
125. Steam Boiler House 2013 LISNER Sp. z o.o. Poznań, ul. Strzeszyńska 2 boilers U-MB of LOOS/BOSCH 2 x 2 tons steam/h WEISHAUPT gas/oil
126. Process installations 2013 LISNER Sp. z o.o. Poznań
ul. Strzeszyńska
Automatic marinade preparation, storage and distribution station for herring production line, together with a washing system. Dosing of liquid and powdered ingredients, mixing and heating. - -
127. Water Boiler House 2013 LAFARGE KRUSZYWA i BETON Sp. z o.o. Wytwórnia betonu Wysogotowo, ul. Grzybowa Renovation of hot water boiler and a gas burner 470 kW RIELLO gas
128. Process installations 2013 Bonduelle Polska Sp. z o.o.
Zakład Produkcyjny
ul. Kilińskiego 11
88-140 Gniewkowo
Modernization of the boiler supplied steam generators CLAYTON 10 tonnes
of steam / h x 2 sets
- -
129. Technical project . Process installations. Control Instrumentation & Automation 2013 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Design and execution of the heat recovery system from Atlas Copco compressors Q=360 kW. Instrumentation, process controls and automation – control system for the heat distribution centre. - -
130. Anti-corrosive proces installations 2013 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Execution of process systems made of stainless steel: - brine system - ice water system - process water system - process steam system. - -
131. Process installations & construction work 2013 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Execution of the central heating system DN125 and the hot service water system with the use of pre-insulated pipes. - -
132. Process installations & construction work 2013 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Execution of the delivery sewage line DN200 for the new sewage pre-treatment plant. - -
133. Technical project . Stainless steel process installations. Control Instrumentation & Automation 2013 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Design and execution of the stainless steel process system; design and execution of instrumentation, process controls and automation for the system for water recovery from the mixers. - -
134. Stainless steel proces installations 2013 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Installation and connection of utilities to container washing facility. A stainless steel system. - -
135. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Delivery and installation of flue gas ducts DN 2000 for the regenerative thermal afterburner (RTO) system PLM 7. - -
136. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Internal gas supply system for process equipment (painting unit 4000 kW, air heaters 52 kW x 4, steam generators YUMAG
320kW x 2 and air handling units 180 kW x 4).
- -
137. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Installation of heater in a new hall for the PLM7. - -
138. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Cooling system for the PLM7 machine. - -
139. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 System for heat recovery from flue gases downstream of the regenerative thermal afterburner RTO,
Q = 800 kW.
- -
140. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Cooling system based on absorptive unit
Q=560 kW and cooling tower
Q = 1500 kW.
- -
141. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Internal process steam distribution system p= 8 bar. - -
142. Process installations 2013 SCHATTDECOR Sp. z o.o.
Tarnowo Podgórne
ul. Sowia 10
Cooling system for the PMD 42 machine.
Q= 330 kW. (chiller and drycooler)
- -
143. Process installations 2013 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. gen. Andersa 1 Delivery and installation of flue gas ducts DN 1400 for the regenerative thermal afterburner (RTO) for PLM5 and PLM6. - -
144. Process installations 2013 MONDI POZNAŃ Sp. z o.o.
62-070 Dopiewo, ul. Wyzwolenia
Delivery and installation of solvent glue supply system for the gluing machine. - -
145. Process installations 2014 „Malta-Decor” S.A. Poznań Upgrade of supply of the
MP-1 machine. New steam and condensate systems.
- -
146. Heat recovery proces installation 2014 SCANENERGI SOLUTIONS A/S IMPERIAL TOBACCO
Tarnowo Podgórne
Heat recovery system. System for heating of supply water to ZWZ. - -
147. Heat recovery proces installation 2014 SCANENERGI SOLUTIONS A/S IMPERIAL TOBACCO
Tarnowo Podgórne
System for heat recovery from condensate of the ESS system. 1 200 kW
148. Steam/condensate proces installations (technical project & assemble ) 2014 FARMUTIL HS S.A.
Śmiłowo
64-812 Kaczory
ul. Przemysłowa 4
Steel, mobile construction of the steam bridge ( layout and installation). Steam supply DN 150 and condensate outlet to the new meat & bone floor drier ( layout and installation). - -
149. Process installations 2014 Xylem Water Solutions
Polska Sp. z o.o.
AQUANET Aglomeracja
Mosina – Puszczykowo
Delivery and technological installation of the potable water ozoning for the city of Poznań ( stainless installations
DN 25 – DN 150 ).
- -
150. Process installation at a tissue paper manufacturing plant 2014 ICT Poland Sp. z o.o.
Kostrzyn nad Odrą
ul. Włoska 3
Exchange of cylinders and guide rings in HOOD air heater ramping chambers of MP11 machine - -
151. Process installations 2014 SCHATTDECOR Sp. z o.o.
Zakład w Głuchołazach
ul. gen. Andersa 1
Varnish and raw material process installation for manufacturing furniture laminates, with a selection and installation of modern CORIOLIS metering and dosing systems – 32 receiving points - -
152. Compressed air system (Concept, detailed design, implementation) 2014 ARDAGH GLASS S.A.
63-800 Gostyń
ul. Starogostyńska 9
Construction of a compressed air system at a plant, from DN 100
to DN 450
- -
153. Process installations 2014 LISNER Sp. z o.o.
Poznań, ul. Strzeszyńska
Zakład w Kaliszu
Installation of the GA VSD 15 FF compressor by ATLAS COPCO, with a capacity of 2.91 m3/min, together with a tank and auxiliary system in a compressor station. - -
154. Process installations 2014 KRONOPOL ŻARY Sp. z o.o.
68-200 Żary
ul. Serbska 56
Construction of a medium-pressure gas path for the burner of a vertical drying station (h=30m) - -
155. Process installations 2014 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Pressure sewer system for process sewage: DN200 (welded PP), DN80 (INOX) for an in-house sewage treatment plant. - -
156. Process installations 2014 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Alternate distribution and automatic reversal system for vegetable oils: soybean/sunflower/rape. Palm oil distribution system. Auxiliary systems: oil tank heating system, process steam, nitrogen, compressed air, process piping system. Tank relocation: 3 x 50 m3. Construction works and electrical systems at the oil pumping station. - -
157. Industrial boiler house 2014 ABP Poland Sp. z o.o.
62-045 Pniewy
ul. Wspólna 1
Re-launch of a steam boiler station after a 6 years' shutdown. LOOS U-HD
1,3 MW x 2
WEISHAUPT
gas and
gas/oil
158. Concept, detailed design and construction of a process system and industrial boiler house together with relevant automatic systems 2014 AQUILA BRZEG Sp. z o.o.
62-300 Września
ul. Objazdowa 6a

Cardboard production plant in
Skarbimierz/Brzeg
Construction of a steam boiler house. Construction of installations for the cardboard machine. Construction of relevant installations at the cardboard machine room. Construction of a compressor station with relevant systems, construction of a glue laboratory with relevant systems. Construction of steel supporting structures for pipelines. Design and construction of automatics and control systems.
Start-up.
8 tons of
steam/h
WEISHAPUT
gas
159. Automatics and control systems 2014 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Replacement of automatics and control systems for vegetable oil installations: soybean, sunflower, rape and palm. - -
160. Process installations 2014 VOLKSWAGEN POZNAŃ Sp. z o.o.
Poznań
ul. Warszawska 349
Inspection and adjustment of 68 burners during shutdown of a coating station. - -
161. Process installations 2014 VOLKSWAGEN POZNAŃ Sp. z o.o.
Poznań
ul. Warszawska 349
Inspection and leak testing of a 19 km gas system in Z1 and Z4 plants of the VW Group - -
162. Process installations 2014 Przedsiębiorstwo Produkcyjno–
Konsultingowe ADOB Sp. z o.o.
Poznań, ul. Kołodzieja 11
Zakład we Wrocławiu
Transfer of steam and water piping. - -
163. Boiler House 2014 Instytut Ochrony Roślin
Poznań
ul. Władysława Węgorka 20
Modernization of a boiler house and boiler automatic systems. PAROMAT SIMPLEX
895 KW x 2
WEISHAPUT
gas
164. Process installations 2014 FARMUTIL HS S.A.
Śmiłowo
64-810 Kaczory
ul. Przemysłowa 4
Installation of gas measurement systems for waste disposal cost optimisation. - -
165. Process installations 2014 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 349
Water supply and drainage systems in a new microbiology and physical chemistry laboratory. - -
166. Process installations 2015 ARDAGH GLASS S.A.
63-800 Gostyń
ul. Starogostyńska 9
Construction of gas network from the pressure regulating and metering station to the production hall - -
167. Design and execution of process installation as well as control and measurement instruments and automation 2015 SCHATTDECOR Sp. z o.o.
Tarnowo Podgórne
ul. Sowia 10

Zakład w Głuchołazach
ul. gen. Andersa 1
Raw material and paint installation with automatics and cabling for 5 new tanks in the raw material and paint warehouse. - -
168. Design and execution of control and measurement instruments and automation 2015 SCHATTDECOR Sp. z o.o.
Tarnowo Podgórne
ul. Sowia 10

Zakład w Głuchołazach
ul. gen. Andersa 1
Comprehensive automatic systems, control systems as well as paint and raw material data archiving systems along with metering, software configuration and start-up. - -
169. Process installation as well as control and measurement instruments and automation 2015 LISNER Sp. z o.o.
Poznań, ul. Strzeszyńska
Extension of the colouring solution system along with software and technological process control system. - -
170. Process installations 2015 KRONOPOL ŻARY Sp. z o.o.
68-200 Żary
ul. Serbska 56
Execution of strength calculations for an existing pipeline for the purpose of replacing heating oil medium with saturated vapour. Redevelopment of a thermal system including reconstruction of heat exchanger. - -
171. Process installations 2015 KRONOPOL ŻARY Sp. z o.o.
68-200 Żary
ul. Serbska 56
Execution of condensate system and sections of steam pipeline between adhesive production plant and MDF line. - -
172. Process installations 2015 ARDAGH GLASS S.A.
63-800 Gostyń
ul. Starogostyńska 9
Disassembly of a gas pipeline on the pipe rack. Execution of a compressed air collector. - -
173. Process installations 2015 VPK Sp. z o.o.
62-300 Września
ul. Objazdowa 6a

Zakład w Radomsku
Installation of a new compressor, new compressed air tank, separator and filters. Connection of compressed air system and supply of pump system. - -
174. Automatics and control systems 2015 MALTA-DECOR
Poznań, ul. Wołkowyska
Execution of stationary water meters for 4 deep bore wells - -
175. Process installations as well as control and measurement instruments and automation 2015 MALTA DECOR Sp. z o.o.
SWISS KRONO GROUP
Poznań, ul. Wołkowyska 28
Replacement of steam and condensate system for heads no. 1, 3, 4 and 5 of the MP1 paper machine. Upgrade of MP1 control adjustment system - -
176. Process installations 2015 MONDI ŚWIECIE SA
86-100 Świecie
ul. Bydgoska 1
Removal of old exchangers for sodium hydroxide and backwash wastewater; installation of new exchangers. Construction of 120 m stainless steel piping (DN250). Construction of support structures and installation of shut-off valves and three-way valves (DN250). - -
177. Process installations - cooling plant 2015 Poznań City Center
Centrum Handlowe przy dworcu
PKP w Poznaniu
Replacement of a section of DN500, DN400 and DN200 cooling system. Removal of welding defects in existing joints together with joint replacement report and 100% radiographic inspection. - -
178. Process installations 2015 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Construction of raw water and treated water systems - -
179. Process installations 2015 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Upgrade of in-house fire protection system - -
180. Process installations 2015 MONDI POZNAŃ Sp. z o.o.
62-070 Dopiewo
ul. Wyzwolenia 34/36
Thermal oil system for printing machine no. 205. - -
181. Process installations 2015 MONDI POZNAŃ Sp. z o.o.
62-070 Dopiewo
ul. Wyzwolenia 34/36
Execution of thermal insulation for thermal oil system together with exchangers and fittings in M205 machine - -
182. Design and construction of stainless steel process system along with control and instrumentation-related works 2015 SCHATTDECOR Sp. z o. o.
Zakład w Głuchołazach
ul. gen. Andersa 1
Execution of paint temperature control system. Extension of cooling system for POLYTYPE system - -
183. Process installations 2015 ARDAGH GLASS SA
63-800 Gostyń
ul. Starogostyńska 9
Overhaul of compressed air system in compressor room no.3. Overhaul of gas system from DN300 collector to pressure reducing station of W1 glass furnace. - -
184. Process installations 2015 GETINGE IC PRODUCTION
POLAND Sp. z o.
62-064 Plewiska
ul. Szkolna 30
Construction of steam and condensate system in the Komorniki plant - -
185. Process installations 2015 ARDAGH GLASS SA
63-800 Gostyń
ul. Starogostyńska 9
Construction of the plant's gas system. Overhaul of gas connections to the production area and water boiler station. - -
186. Process installations - pressure boosting station 2016 VOLKSWAGEN POZNAŃ
Poznań, ul. Warszawska
Dismantling of the entire water boosting station operating with deep-well pumps. New placement of Behncke bed filter and aerator. Replacement of the filter bed in new and old filters. Construction of new piping system including the replacement of multi-way valves. System start-up, measurement-taking and preparation of as-built documentation. - -
187. Design and execution of process installations as well as Control Instrumentation & Automation 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Process wastewater system, stainless version, welded (DN80-DN250) for a new building - M&F kitchen. Reconstruction of pumped process wastewater system in fire-safety version - butt welded (DN200) for a new building - M&F kitchen. System design. - -
188. Design and execution of process installations 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Compressed air system for a new packaging line. - -
189. Design and execution of process installations 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Nitric acid and sodium hydroxide system for a new M&F kitchen - stage 1. - -
190. Design and execution of process installations 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Vinegar system for a new M&F kitchen - stage 1. - -
191. Design and execution of process installations 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Chilled water, raw water, softened water, and compressed air systems for a new M&F kitchen - stage 1. - -
192. Design and execution of construction 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Stainless steel service platforms and decks for a new M&F kitchen - stage 1. - -
193. Design and execution of process installations as well as Control Instrumentation & Automation 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Execution of three independent palm oil filtration systems with an automatic filtration case emptying system. Design and installation works, two automation systems. Design and execution of automation systems for a rapeseed oil filtration plant. - -
194. Design and execution of process installations as well as Control Instrumentation & Automation 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Execution of a cooling system for a colloid mill. Design and execution of automation systems for a colloid mill cooling system. - -
195. Design and execution of process installations 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Chilled water, vinegar, compressed air systems for a new M&F kitchen - stage 2. - -
196. Design and execution of process installations as well as Control Instrumentation & Automation 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Pumped condensate system in WII department. Design and execution works. Design and execution of automation systems for the condensate system. - -
197. Design and execution of construction 2016 UNILEVER POLSKA SA
Oddział Żywności
Poznań, ul. Bałtycka 43
Stainless steel service platforms for a new M&F kitchen - stage 2. - -
198. Industrial installations 2016 ARDAGH GLASS SA
63-800 Gostyń
ul. Starogostyńska 9
Modernization of compressor room no. 3. Replacement of compressors. Disassembly of existing piping and fittings. Construction of a new system. - -
199. Industrial installations 2016 PetRing PACKAGING Sp. z o.o.
ul. Przylep – Ogrodnicza 5
66-015 Zielona Góra
40 bar compressed air system for production equipment. Modernization of the compressor room including replacement of systems and compressors. - -
200. Building permit design 2016 Good Food
Products Sp. z o.o.
ul. Skórzewska 21
60-185 Skórzewo
Building permit design for compressed air system. Main compressor room design. Design for compressor heat recovery system. - -
201. Building permit design 2016 SAINT-GOBAIN HPM SA
Polska Sp. z o.o.
62-600 Koło, ul. Nortona 1
Building permit design for a container boiler room with gas system - -
202. Building permit design 2016 STOLZLE CZĘSTOCHOWA Sp. z o.o.
ul. Warszawska 347
42-209 Częstochowa
Building permit design for modernized compressed air system for production lines and glass furnace. - -
203. Design and execution of Control Instrumentation & Automation 2016 UNILEVER POLSKA SA
Oddział Żywności,
Poznań, ul. Bałtycka 43
Modernization of CIP automation systems. - -
204. Design and execution of Control Instrumentation & Automation 2016 ADM Szamotuły Sp. z o.o.
ul. Chrobrego 29
64-500 Szamotuły
Design and execution of modernized automation systems for HDO 6.01-61 boiler; capacity 25000 kg steam/h. Manufacturer: STANDARD KESSEL. Execution of a power supply and control cabinet. Arrangements with the Central Laboratory of Technical Supervision and Technical Supervision Office. 25 000 kg steam/h WKG 70/3-A
WEISHAUPT
205. Design and execution of Control Instrumentation & Automation 2016 ADM Szamotuły Sp. z o.o.
ul. Chrobrego 29
64-500 Szamotuły
Design and execution of a 400 kW generator for heat recovery from flue gases - type H1.3. Manufacturer: ENERGO-SPAW. The energy recovered from the flue gases of HDO 6.01-61 boiler is used for heating the air required for burning E gas in WKG 70/3-A burners. Arrangements with the Central Laboratory of Technical Supervision and Technical Supervision Office. - -
206. Design and execution of Control Instrumentation & Automation 2016 SCHATTDECOR Sp. z o.o.
Zakład w Głuchołazach
ul. gen. Andersa 1
Design and execution of SCADA WinnCC visualization for a coating system. - -
207. Design and execution of Control Instrumentation & Automation 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Design and execution of automation for a condensate system. - -
208. Design and execution of Control Instrumentation & Automation 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Design and execution of a heating cable system in a process plant. - -
209. Design and execution of Control Instrumentation & Automation 2016 ABP FOOD Sp. z o.o.
62-045 Pniewy
ul. Wspólna 1
Design and execution of automation for process water preparation system in a high-temperature water boiler room. - -
210. Design and execution of Control Instrumentation & Automation 2016 SCHUR FLEXIBLE POLAND Sp. z o.o.
62-006 Bogucin
ul. Pilotów
Design and execution of automation for thermal oil system in thermal oil boiler room. - -
211. Process installations 2016 KRONOPOL ŻARY SWISS KRONO GROUP
68-200 Żary, ul. Serbska 56
Design and installation of a thermal oil system for a new HYMMEN press - -
212. Process installations 2016 SCHUR FLEXIBLE POLAND Sp. z o.o.
62-006 Bogucin
ul. Pilotów
Thermal oil boiler room and thermal oil system. 400 kW RIELLO
213. Process installations 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Installation of heat recovery system on vapors from thermal degassing tanks. - -
214. Process installations 2016 SAIPEM SA
72-400 Świnoujście, ul. Fińska 1
Teren GAZOPORTU
Repair of hypochlorite system at the LNG terminal. - -
215. Conceptual diagram 2016 EUROSERVICE
Zakłady Przemysłu Tłuszczowego w Surochowie
00-078 Warszawa
ul. Piłsudskiego 3
Conceptual diagram for a tri-generation process: boiler room 20 t steam/h + 1MW cooling + 1.2 MW electricity. Idea diagram - extension proposal. - -
216. Building permit design and detailed design 2016 Unilever Polska Sp. z o.o.
02-305 Warszawa,
Aleje Jerozolimskie 134.
Design for Unilever Food Solutions. Design for balanced mechanical ventilation system. Design for interior reconstruction for Culinary Training Centre. - -
217. Process installations 2016 VOLKSWAGEN POZNAŃ Sp. z o.o.
Poznań, ul. Warszawska 349
Replacement of multi-way valves at Behncke iron removers. - -
218. Process installations 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Replacement of DN 100 beer piping between beer valve facilities and DTP pump in the Filtration area. - -
219. Process installations 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Installation of multi-way Tuchenhagen valves at deoxygenated water system for FREE beer. - -
220. Process installations 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Replacement of DN350 hot water piping in the Brew House. - -
221. Process installations 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Replacement of leaking DN150 hot water piping in the Brew House, in SUW EUWA area. - -
222. Process installations 2016 Kompania Piwowarska SA
Poznań, ul. Szwajcarska 11
Execution of aseptic connections for measurements. - -
223. Process installations 2016 Kompania Piwowarska SA Poznań, ul. Szwajcarska 11 Changing the location of sampling points in the Filtration area. - -
224. Process installations 2016 Fabryka Kształtek Styropianowych PROFI-ENAMEL Wronki Disassembly of steam dryers and dryer drainage systems. Disassembly of measurement automation. - -
225. Water heating plant 2016 GONVARI POLSKA Września, ul. Działkowców Krajalnia blach karoseryjnych Internal inspection and pressure test of LOOS boiler. 1 MW WEISHAUPT
226. Steam heating plant 2016 LISNER Sp. z o.o. Poznań, ul. Strzeszyńska Preparation of boilers for internal surveillance inspection. 2 x 2 t steam/h WEISHAUPT
gas/oil
227. Thermal oil heating plant 2016 FLEX FILMS EUROPA Sp. z o.o.
62-300 Września,
ul. Sikorskiego 48
Internal inspection and pressure test of a thermal oil boiler and separation tanks. 3 MW
228. Design and execution of process installations as well as Control Instrumentation & Automation 2017 UNILEVER POLSKA SA
Oddział Żywności,
Poznań, ul. Bałtycka 43
Execution of vinegar filtration system. Design and installation works, automation system. - -
229. Container heating plant and Control Instrumentation & Automation 2017 SAINT-GOBAIN HPM SA
Polska Sp. z o.o.
62-600 Koło, ul. Nortona 1
Construction of a containerised water boiler room. 2 x VITOPLEX 200 Design and execution of boiler automation. 2 x 1 MW RIELLO RS
230. Design and execution of Control Instrumentation & Automation 2017 GONVARRI Polska Sp. z o.o.
62-300 Września
ul. Działkowców
Krajalnia blach karoseryjnych
Design and execution of a system limiting peak water consumption by water boiler room 1 MW WEISHAUPT
231. Design and execution of Control Instrumentation & Automation 2017 MALTA DECOR SWISS KRONO GROUP
Poznań, ul. Wołkowyska
Design and execution of modernized ZFR boiler automatics for capacities up to 28,000 kg steam/h (LOOS). Execution of a new power supply & control cabinet. Upgrading of SCADA WinCC visualization for steam boiler room. Arrangements with the Central Laboratory of Technical Supervision and Technical Supervision Office. - -
232. Industrial installations. Cooling plant 2017 Centrum Handlowe
AVENIDA POZNAŃ
Replacement of cooling system components in WSHP cooling plant - from DN200 to DN450. - -
233. Industrial installations 2017 Fabryka Tektury Falistej TFP Sp. z o.o. Zakład w Babimoście Modernization of steam and condensate system for a Fosber corrugator. - -
234. Industrial installations 2017 Fabryka Tektury Falistej TFP Sp. z o.o. Zakład w Dziećmierowie k/Kórnika Construction of steam feeding for a MASTERFLEX printing machine - -
235. Industrial installations 2017 SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach ul. Gen. Andersa 1 Construction of flue gas ducts to RTO3 flue gas treatment system. - -
236. Industrial installations 2017 Glaxo Smith Kline Pharmaceuticals S.A. ul. Grunwaldzka 189 60-322 Poznań Replacement of CH5 and CH6 chillers for the production building 2 x 950 kW DAIKIN
237. Industrial installations 2017 Kompania Piwowarska S.A. ul. Szwajcarska 11 61-285 Poznań Steam heating hub with a sterile filter. ~ 3000 kg steam/h
238. Water boiler house 2017 MARMITE Sp. z o. Zakład Produkcyjny w Łowyniu ul. Szkolna 16 64-426 Łowyń Internal revision and pressure test of VIESSMANN Turbomat – Duplex water boilers (2 units) 1.2 MW
1.5 MW
WEISHAUPT
gas/oil
239. Industrial installations 2017 ADM Szamotuły Sp. z o.o.
ul. Chrobrego 29
64-500 Szamotuły
Construction of a line for GMO soybean oil unloading and loading to rail tankers and tanker trucks. Construction of a soybean oil system in the pipe rack and storage tank area. - -
240. Industrial installations 2017 ADM Szamotuły Sp. z o.o.
ul. Chrobrego 29
64-500 Szamotuły
Installation works in the boiler house during the summer downtime. - -
241. Industrial installations 2017 Kompania Piwowarska S.A.
ul. Szwajcarska 11
61-285 Poznań
DOC-10 Installation of CVMD valves on ammonia systems. - -
242. Industrial installations 2017 Kompania Piwowarska S.A.
ul. Szwajcarska 11
61-285 Poznań
DOC – 53 Replacement of shut-off fittings on ammonia systems. - -
243. Industrial installations 2017 Kompania Piwowarska S.A.
ul. Szwajcarska 11
61-285 Poznań
CKT Steam system modernization in the oxygen filters area. - -
244. Engineering 2017 KRONOPOL ŻARY SWISS KRONO GROUP
68-200 Żary, ul. Serbska 56
Technological documentation for thermal oil system for a KT9 press. Supporting structures design. - -
245. Compressed Air System Engineering 2017 Federal-Mogul BIMET S.A.
al. Grunwaldzka 481
80-953 Gdańsk
Design of a modernization of a wide-area compressed air system including modernization and selection of compressors. Design of a compressor heat recovery system. - -
246. Industrial installations 2017 KRONOPOL ŻARY SWISS KRONO GROUP
68-200 Żary, ul. Serbska 56
Construction of a thermal oil system and supporting structure for a HYMMEN press. - -
247. Industrial installations 2017 MONDI POZNAŃ Sp. z o.o.
62-070 Dopiewo
ul. Wyzwolenia 34/36
Construction of a process installation of solvent glue to the dosing unit No. 2 in a flexographic machine. - -
248. Industrial installations 2017 Curtis Health Caps Sp. z o.o.
ul. Batorowska 52
62-081 Przeźmierowo
Design and construction of a service platform for a feeding tank with a gas removal unit. Design and construction of a „screw-mounted platform”. - -
249. Design and construction of a process installation; civil works 2017 Skanem Poznań Sp. z o.o.
Swadzim, ul. Poznańska 34b
62-080 Tarnowo Podgórne
Cooling water system. - -
250. Process installation 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Modernization of CIP drains in the Ohmic kitchen area. - -
251. Design and construction of a process installation; civil works 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Stainless steel process sewage system in the new packing hall area. - -
252. Design and construction of a process installation; civil works 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Stainless steel process sewage system in the Ohmic kitchen area. - -
253. Design and construction of a process installation 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Stainless steel systems: compressed air, process water, domestic water in the new packing hall area. - -
254. Design and construction of structures 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Stainless steel supporting structures and service platforms in the new packing hall area. - -
255. Design and construction of structures 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Service platform above a SIG dispensing and packing machine - -
256. I&C design and construction 2017 MALTA DECOR SWISS KRONO GROUP
Poznań, ul. Wołkowyska 28
Modernization of the condensate pumps control system. Construction of a new supply and control cabinet. Modernization of SCADA WinCC visualization. Software changes to SIEMENS S7-300 controller. - -
257. I&C design and construction 2017 Kompania Piwowarska S.A.
ul. Szwajcarska 11
61-285 Poznań
Design and construction of automation system for the filtration water recovery unit - -
258. Steam boiler house 2017 ADM Szamotuły Sp. z o.
ul. Chrobrego 29
64-500 Szamotuły
Revision of the heat recovery system 25 000kg steam/h WKG 70/3-A WEISHAUPT gas/oil
259. I&C design and construction 2017 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Construction of a nitrogen detection system in the production hall. - -
260. I&C design and construction 2017 MALTA DECOR SWISS KRONO GROUP
Poznań, ul. Wołkowyska 28
Modernization of the control system for the permeate tank make-up water system, including water meters and dosing pumps. Modernization of SCADA WinCC visualization. Software changes to SIEMENS S7-300 controller. - -
261. Water boiler house 2017 Marmite Sp. z o.o.
ul. Szkolna 16
64-426 Łowyń
Boiler house commissioning. External revision with the assistance of the Office of Technical Inspection (UDT). VIESSMANN Turbomat 2 units. 1.2 MW
1.5 MW
WEISHAUPT
gas/oil
262. Steam boiler house 2017 CEDC International Sp. z o.o.
ul. Kowanowska 48
64-600 Oborniki
Modernization of the permeate pumps control system in a S7-300 controller and SCADA WinCC. 4 tons
steam/h
WEISHAUPT
gas
263. Compressed air system 2017/2018 Samsung Electronics Poland Manufacturing Sp. z o.
ul. Adama Mickiewicza 52
64-510 Wronki
Construction of a compressor building and a compressor cooling system - -
264. Industrial installations 2017/2018 Farmutil HS
ul. Przemysłowa 4
64-810 Śmiłowo
Design and construction of steam and condensate system for a new process line of a continuous operation destructor 1 x 11320 kg
steam/h
265. Design and construction of a process installation and I&C 2017/2018 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Construction of a soybean and rapeseed oil filtering system including a system for automatic emptying of filtration housings. Engineering, assembly and automation. - -
266. Design and construction of a process installation and I&C 2017/2018 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Construction of an unloading station for compressed nitric acid, including steel structures, ventilation system and acid pipelines.
267. Design and construction of a process installation 2017/2018 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Water and sewage system in a new physicochemical laboratory - -
268. Industrial installations 2018 Schattdecor Sp. z o.o.
ul. Sowia 10
62-080 Tarnowo Podgórne
Nitrogen system 940 Nm3/h
23,625 kW
269. Industrial installations 2018 Schattdecor Sp. z o.o.
ul. Sowia 10
62-080 Tarnowo Podgórne
Cooling hub 34 kW
270. Industrial installations 2018 Farmutil HS
ul. Przemysłowa 4
64-810 Śmiłowo
Construction of a steam, condensate and air connection to feather hydrolyser - -
271. Industrial installations 2018 Farmutil HS
ul. Przemysłowa 4
64-810 Śmiłowo
Replacement of a steam reduction pathway in the batch operation destructors line No. 6 - -
272. Industrial installations 2018 Farmutil HS
ul. Przemysłowa 4
64-810 Śmiłowo
Modernization of the steam system at the batch operation destructors line No. 7. - -
273. Compressed air system 2018 Good Food Products Sp. z o.o.
ul. Szumin 15
62-080 Tarnowo Podgórne
Compressed air system for production purposes. Construction of a compressor building and compressed air mains. Compressor heat recovery system. - -
274. I&C design and construction 2018 SCHATTDECOR Sp. z o.o.
Zakład w Głuchołazach
ul. Gen. Andersa 1
A system for recovering thermal energy from flue gas downstream of the RTO3 regenerative thermal afterburner. Construction of the automation system; extension of a SIEMENS S7-300 controller. - -
275. I&C design and construction 2018 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Safeguards for oil unloading systems. Construction of a control system in a S7-300 controller - -
276. I&C design and construction 2018 SCHATTDECOR Sp. z o.o.
ul. Sowia 10
62-080 Tarnowo Podgórne
Construction, connection and commissioning of the automation system for the nitrogen preheating unit. - -
277. I&C design and construction 2018 SCHATTDECOR Sp. z o.o.
ul. Sowia 10
62-080 Tarnowo Podgórne
Construction, connection and commissioning of the ice water automation system for the IOT. - -
278. PLC programming 2018 SCHATTDECOR Sp. z o.o.
Zakład w Głuchołazach
ul. Gen. Andersa 1
Migration of the design of a SIEMENS S7-300 controller to a new version of TIA PORTAL V14. - -
279. I&C design and construction 2018 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Modernization of a compressed air supply system for the M&F. - -
280. I&C design and construction 2018 UNILEVER POLSKA S.A.
Oddział Żywności Poznań
ul. Bałtycka 43
Construction, connection and commissioning of the automation system for the M&F oil filtration unit. Programming of a SIEMENS S&-300 controller. - -
281. I&C design and construction 2018 Good Food Products Sp. z o.o.
ul. Szumin 15
62-080 Tarnowo Podgórne
Construction, connection and commissioning of the automation system for the compressor heat recovery unit. Programming of a SIEMENS S7-300 controller. - -
282. Process installation 2018 MONDI POZNAŃ Sp. z o.o.
62-070 Dopiewo
ul. Wyzwolenia 34/36
Diagnostics and repair of the afterburner system. - -
283. Thermal oil boiler house 2018 MONDI POZNAŃ Sp. z o.o.
62-070 Dopiewo
ul. Wyzwolenia 34/36
Repair and commissioning of the thermal oil boiler after a coil failure. Boiler HTT
2250 kW
WEISHAUPT
gas